Bloomington Transportation Plan

From FultonWiki
Jump to navigation Jump to search

Multiuse Paths

N Fee Lane Multiuse Path and Protected Bike Lanes

Provide a multiuse path and protected bike lanes on N Fee Ln from E 17th St to Hwy 45/46

17th St Multiuse Path and Bike Lanes

Provide a multiuse path and bike lanes on 17th St from I-69/Hwy 45 to Hwy 45/46

Status: Completed on the west side and from in front of the stadium to the bypass. Work on the area from Tri-North to the stadium should commence in 2022 and be finished the following year.

https://bloomington.in.gov/engineering/projects/17thpath

MU-3 Multiuse Path N Crescent Rd/W Fountain Dr Multiuse Path

This project will connect the existing B-Line Trail terminus at Adams Street with the multiuse path on the 17th Street I-69 overpass. The proposed route will be along the eastern edge of West Fountain Drive to North Crescent Road, then north along the eastern edge of North Crescent Road to West 17th Street. Additionally, the project will reconstruct the intersection of West Fountain Drive and North Crescent Road. The project is programmed to receive federal funding assistance for construction and construction engineering.

Status: To be completed Spring 2022.

https://bloomington.in.gov/engineering/projects/b-line

MU-4 Multiuse Path Indiana University Multiuse Path

Provide a multiuse path from E 10th St to E 3rd St between N Woodlawn Ave and N Jordan Ave

MU-5 Multiuse Path S Clarizz Blvd Multiuse Path and Bike Lanes

Provide a multiuse path and bike lane on S Clarizz Blvd from E Moores Pike to E 3rd St

MU-6 Multiuse Trail E Thornton Dr Multiuse Trail Extension

Extend the E Thornton Dr multiuse trail from S Walnut St to the B-Line Trail

MU-7 Multiuse Path S Highland Ave Multiuse Path and Bike Lanes

Provide a multiuse path and bike lanes on S Highland Ave from E Winslow Rd to E Hillside Dr

MU-8 Multiuse Path S High St Multiuse Path and Bike Lanes

Provide a multiuse path and bike lanes on S High St from E Winslow Rd to E 3rd St

MU-9 Multiuse Path Ramp Tunnels for Bloomfield Rd Interchange

Tunnel through the two interchange ramps so the multiuse path will avoid the traffic crossings

MU-10 Multiuse Path N Dunn St Multiuse Path

Provide a multiuse path on N Dunn Street from Hwy 45/46 to N Old State Road 37

Neighborhood Greenways

NG-1 W 7th St Neighborhood Greenway

Provide a neighborhood greenway on W 7th St from N Ritter St to S Rogers St and a protected bike lane on W 7th St from S Rogers St to the B-Line Trail

NG-2 E 7th St Neighborhood Greenway

Provide a neighborhood greenway on E 7th St and E Longview Ave from S Union St to N Glenwood Ave

https://bloomington.in.gov/engineering/projects/7thgreenway

NG-3 E Morningside Dr Neighborhood Greenway

Provide a neighborhood greenway on Glenwood Ave, E Longview Ave and E Morningside Dr from S Clarizz Blvd to E 3rd St and S Morningside Dr extension

NG-4 E Hunter Ave Neighborhood Greenway

Provide a neighborhood greenway on W Howe St, Smith Ave, and E Hunter Ave from S Walker St to S High St

NG-5 Allen St/E Covenanter Dr Neighborhood Greenway

Provide a neighborhood greenway on Allen St, E Southdowns Dr, E Ruby Ln, E Marilyn Dr, and E Covenanter Dr from W Patterson Dr to S College Mall Rd

Status: Allen Street: Walnut to Henderson complete

NG-6 S Hawthorne Dr Neighborhood Greenway

Provide a neighborhood greenway on S Hawthorne Dr and S Weatherstone Ln from E 3rd St to E Thornton Dr

NG-7 E Thornton Dr Neighborhood Greenway

Provide a neighborhood greenway on E Thornton Dr and Arden Dr from S Henderson St to S High St

NG-8 W Graham Dr Neighborhood Greenway

Provide a neighborhood greenway on W Graham Dr and S Bryan St from W Kissell Dr to the B-Line Trail

Status: Contract awarded to Rivertown Construction LLC. Construction date to be determined.

NG-9 E Arden Dr Neighborhood Greenway

Provide a neighborhood greenway on E Arden Dr from S High St to S Montclair Ave

Protected Bike Lanes

PBL-1 N Fee Lane Protected Bike Lanes

Provide protected bike lanes on N Fee Ln from E 10th St to the 45/46 Bypass

PBL-2 7th St Protected Bike Lanes

Provide protected bike lanes on 7th St from the B-Line Trail to N Union St Status: Complete from the B-Line to Woodlawn.

PBL-3 E Covenanter Dr Protected Bike Lanes

Provide protected bike lanes on E Covenanter Dr from S College Mall Rd to S Clarizz Blvd

Corridor Studies

College Ave/Walnut St N-S Corridor Study

E Third St/Atwater Ave E

S Walnut St Corridor Study

10th St corridor study

Citywide circulation change study

Misc

Current Infrastructure Projects